24-HOUR EMERGENCY LINE: 1-844-808-4904
45 MMscf/d sour gas processing capacity
CAPABILITIES
Where Valhalla fits in
Valhalla marks an important step in CSV’s continued expansion north, reinforcing its ability to operate efficiently in remote and technically demanding environments.
The facility strengthens CSV’s connection to regional producers and supports long-term reliability for customers developing projects in the northern Montney.
By combining local operating presence with proven design performance, Valhalla extends CSV’s network and provides a foundation for future growth in this part of Alberta.
Sour gas processing
Designed for 45 MMScf/d at 0.79 percent H₂S, with operating capacity up to 55 MMScf/d
Acid gas disposal
Equipped for acid gas injection, supporting safe and continuous sour gas management
Refrigeration system
Mechanical refrigeration unit designed for -32 °C operation and capable of -35 °C, producing C3/C4 NGL and C5+ products
Process compression
Total installed horsepower, including acid gas injection, is 4,400 HP
Liquids handling
Designed for 105 m³/d of liquids handling capacity
Remote operations
Plant operations can be monitored and restarted remotely, reducing downtime

STRATEGIC VALUE
A foothold for northern growth
The facility gives CSV a critical presence in a part of the Montney region where producers are active but midstream infrastructure is constrained. Having an operating base here strengthens CSV’s ability to serve customers and maintain relationships while evaluating opportunities for development.
VALHALLA
While Valhalla operates in a remote area, its role in CSV’s portfolio supports the stability producers rely on. By running consistently and building customer confidence, the plant helps strengthen the regional economy and creates room for future opportunities to deliver shared value.






