24-HOUR EMERGENCY LINE: 1-844-808-4904
150
MMscf/d sour gas capacity
30,000
bbl/d crude and condensate handling
CAPABILITIES
Where Karr fits in
Located in northwestern Alberta, this facility was acquired and expanded by CSV to become its first fully operated gas plant.
Taking over this asset meant completing and adapting a design that was already underway, which required practical problem-solving and engineering flexibility.
The result showed CSV can manage complexity and deliver reliable service that customers can count on.
Karr strengthens CSV’s presence in a key producing corridor, connecting regional producers to the TC Energy NGTL Sales Gas Pipeline System and the Pembina Liquids System.
Its location and infrastructure make it a cornerstone of CSV’s operating platform in northwestern Alberta, supporting ongoing growth and regional development.
Proven expansion
Successfully engineered and executed an expansion after acquisition
Operational strength
Established CSV’s reputation for availability and performance
Sour gas processing
Handles sour gas streams with an amine system designed for up to 2% H₂S
Liquids management
Built to process large volumes of water, crude, and condensate
Refrigeration system
Mechanical refrigeration unit capable of -35°C, producing C3/C4 NGL and C5+ products
Process compression
Total installed process compression capacity of 33,680 horsepower

STRATEGIC VALUE
The foundation of CSV’s operating model
As CSV’s first operated asset, this facility marked the company’s transition from building projects to running them. It became the foundation of CSV’s operating model and remains one of the strongest contributors to the company’s financial base and customer relationships.
KARR
The site contributes to the region by providing stable processing services that support producer activity and local employment. Its reliability strengthens customer and supplier relationships and provides a financial base for CSV to invest in future projects and programs.






